Bid Information

Current Bids
Grainger Springs Pump House Replacement

  • This project will replace the existing aging water pump facility at the Grainger Springs spring wells site. The project will build a new pump building and new pumps.
  • This project is currently in the bidding phase.
Grainger Springs Pump House Replacement Plans

Grainger Springs Pump House Replacement Specifications

Bid Results - Grainger Springs Final


Current City Projects

Current projects are categorized below by City Managed Projects (City pays for design and construction) and Developer Managed Projects (Developer pays for design and construction).

Check the Legal Notices & Press Releases page for notices and advertisements related to these and other projects.

City Managed Projects (Capital Improvement Projects-CIP)

Public Works MTU and Radio Communication Installation
  • This project will build a new MTU control panel and radio panel, and relocate the equipment location to the new Public Services building. This project will also upgrade the SCADA control panel at lift station #7 and add a new level transmitter to the wet well at lift station 21.
  • Project was awarded to Source Electric on May 10, 2022.
  • Construction effort is expected to start March 20, 2023.

 


Tacoma Point Reservoir Replacement
  • This project will build a new 3.2MG water reservoir on the existing reservoir site in the North Lake Tapps area.This new reservoir will replace an aging smaller tank and provide better water storage to the developing North Lake Tapps area.
  • Project was awarded to T. Bailey Construction on June 22, 2021.
  • The City has issued a substantial completion to T. Bailey on February 22, 2023.
  • Final completion of punch list items is ongoing.

Allan Yorke Park Project - Phase 1
  • This project includes demolition of a metal building, clearing and earthwork to the site, and constructing a new baseball/multiuse field.  The new supporting infrastructure to the field includes a restroom building,  new sidewalks, 109 space parking lot, fencing, and future playground area.
  • The Project was awarded to Premier Field Development on January 11, 2022.
  • This Project is currently under construction.
Grainger Springs Pump Facility Project
  • This project will replace the existing aging water pump facility at the Grainger Springs spring wells site. The project will build a new pump building and new pumps.
  • This project is currently in the bidding phase. 
  • See Current Bids  Section Above


Lift Station #20 Rehabilitation Project
  • This project will provide restoration to the wet well at Lift station #20. The project will replace corroding equipment in the wet well, patch deteriorating concrete and provide a new epoxy coating to the concrete.
  • The project is currently in design phase.
East Pierce Fire Department Center Project
  • This project is a commercial building currently under construction.
Stor-it Here Expansion Project
  • This is a commercial project currently under construction.
Cedar Cove Residential Development
  • This is a single-family residential development currently under construction.
Peak 410 Development
  • This a commercial development project currently under construction.


Office Hours:
Monday - Friday
8:30am - 5:00pm

Contact:
Engineering

Location:

Public Services Center
21719 96th ST E
Buckley, WA 98321

Mailing:
City of Bonney Lake
Attn: Engineering
21719 96th ST E
Buckley, WA 98321

Phone: 253-447-4356

Fax: 253-862-1116