Contacts






Date:  


Frequently Viewed Business Pages


Permits




Current Projects




Engineering




Design Standards




Forms






  You Are Here: Home: Business: Growth & Development Resources: Engineering
 
ENGINEERING DIVISION
General Information:
The mission of the engineering division is to plan, design, and construct the transportation and utility infrastructures of the City to meet the needs of the rapidly growing population and commercial businesses in a way that is safe, cost effective, timely, and consistent with the Comprehensive Plan and current Design Standards.
 
The City of Bonney Lake Engineering Division, in the Public Works Department, serves the needs of the citizens of Bonney Lake by providing professional engineering services to the community and City government. The division is dedicated to maintaining a business friendly and professional environment with a high level of responsiveness to elected officials, city staff, citizens, developers, and consultants. Emphasis is placed on protecting the public health, safety, and welfare of our neighborhoods, and improving the quality of life for residents and visitors.
 
The Engineering Division employs professional and technical staff members. Currently, the Engineering Division staff includes the City Engineer, an Assistant City Engineer / Utility Engineer, two Project Managers, and an Engineering Technician (see the Public Works Organization Chart). 

The Engineering Department’s office is located at the City Hall Annex Building, and is open from 8:30 a.m. to 5:00 p.m., Monday through Friday. Contact information may be found below.


Development Policies & Public Works Design Standards: 
¤    Download Development Policies & Public Works Design Standards


Transportation Improvement Plans (TIP):
¤     Current Six Year TIP (2008-2013) (303 K) 
¤     2006 Six Year TIP (2007-2012) (19 K) 
¤     2005 Six Year TIP (2006-2011) (1.01 M)


Current Project Downloads:
¤     2008 CIP Plan 

¤     192nd Ave. Corridor Plan (15.4 M) [Download in three parts: Part 1 | Part 2 | Part 3 ]
¤     192nd Ave. Corridor Roadway Section - Concept Cross Section (757 K)
¤     Lake Bonney Integrated Aquatic Management Plan (4.29 M)
¤     Public Works Capital Improvement Projects (11 K) 

¤     Public Works Development Projects (10 K) 

¤     SR410 & Sumner Buckley Hwy Intersection Improvement Project (1.85 M)


Multiyear Project Planning:

¤     Transportation Comprehensive Plan (10.16 M) 
      [Download in two parts: Part 1 (4.9 M) | Part 2 (5.4 M)]

¤     Eastown Comprehensive Plan (1.73 M)

¤     Downtown Comprehensive Plan (5.14 M)

¤     Non Motorized Transportation Plan (15.6M)
      [Download in three parts: Part 1 | Part 2 | Part 3]

¤     Street Lighting Plan (9 K)

¤     Sewer Comprehensive Plan: 
      Part 1 (4.5 M) | Part 2 (3.9 M)

¤     Water Comprehensive Plan: 
      Part 1 (4.1 M) | Part 2 (2.6 M) | Part 3 (6.5 M) 
      Part 4 (2.5 M) | Part 5 (7.1 M) | Part 6 (5.7 M)



Maps:

¤      City Maps
 



Permitting:
Engineering is in charge of the Public Works Permits, such as Right of Way/Road Approach Permits and Encroachment Permits. For applications and more information please visit our Public Works Permitting Page.

 
Contact:
City Engineer
Utilities Engineer

Project Managers

Engineering Technician

Administrative Specialist II – Customer Service

Location
8720 Main St E
Bonney Lake, WA
98391-8850
 
Mailing Address
Attn: Engineering
P.O. Box 7380
Bonney Lake, WA
98391-0944
 


 
 
 
 



Copyright © 2007 City of Bonney Lake. All Rights Reserved | Disclaimer | Sitemap